Construction Power Station Bukit Ibam

Construction of Workshop/Office/Power station Bukit Ibam 1961-1962.

Picture6aPicture7aPhoto above shows the newly constructed building with the main workshop situated at the left hand side, the Iron Ore Treatment plant in the centre area, and the new Power Staion in the right hand section of the building.

Picture8a

Photos’ above and below shows the Electrical Linesmen building the HT Power line from the new Power Station to the Mine office and housing area in 1962.

Picture9aPicture10a

Photos’ above and below show the construction of the new Power Station at the right hand end of the main workshop/ Iron Ore treatment plant building.

Picture11aPicture12aPicture13aThe photo shows the original temporary Power Station at Bukit Ibam during the early days prior to the new Power Station going on-line in 1962.

mamadou

Advertisements

Author:

Spent most of the life in engineering and project management. Now having the opportunity to see the world beyond my usual nest. Travel extensively to Third World Countries. Aaahh... now everything is possible

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s